Laserfiche WebLink
m o <br /> :3 = <br /> College Park at Mountain House Specific Plan III <br /> - Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> �• begins during the nesting season(April 1-August <br /> 0 31),pre-construction surveys shall be conducted <br /> N during the nesting season in suitable nesting <br /> CD habitat within 100 feet of areas of project <br /> Cn <br /> activity.The survey shall be conducted within <br /> n the 2 weeks before construction or tree removal <br /> begins.A setback of 100 feet from loggerhead <br /> m shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> N ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Blackbird.If project construction begins during <br /> sa the nesting season(April I.-August 31),pre- <br /> construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity.A <br /> setback of 500 feet from California horned lark <br /> �• and tricolored blackbird nesting areas shall be <br /> w <br /> established and maintained during the nesting <br /> a season for the period encompassing nest building <br /> and continuing until fledglings leave nests.This <br /> CD <br /> o, setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> mare known to be occupied. Setbacks shall be <br /> CO 0 marked by brightly colored temporary fencing. <br /> 4.10-9 Biological Resources—Conversion of San Joaquin Before construction S]COG,in <br /> _._.. ...._.�� ..• _. � ,..�.,..� T-.�-r ----- -�---�----_�_�_��.�-�- ---T••,�•--� -•--R-�---,.�.�.�..� .--� —....�--...rt .T�_,_,_rte ..�- m�- �.---� <br />