Laserfiche WebLink
W 0 <br /> M o <br /> :3 = <br /> rnCollege Park at Mountain House Specific Plan III <br /> - Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> below: <br /> o Special-Status Plants Before construction SJCOG,in <br /> < Before any ground-disturbing or vegetation- consultation with <br /> C/) clearing activities,a qualified botanist shall USFWS and DFG <br /> m conduct surveys for the special-status plant <br /> species identified in Table 4.11-1 of the EIR. <br /> 0 Surveys shall be conducted at the appropriate <br /> time,when the target species would be in flower <br /> and therefore clearly identifiable(i.e.,blooming <br /> period)and in all areas of suitable habitat that <br /> would potentially be disturbed.If no special- <br /> status plants are found,no further mitigation <br /> cNn shall be required. <br /> • If special-status plants are found and the <br /> populations can be avoided during project <br /> implementation,they shall be clearly marked <br /> in the field by a qualified botanist for <br /> avoidance during construction activities <br /> vIf special-status plant populations cannot be <br /> 0avoided,consultations with DFG and/or <br /> K USFWS may be required,depending on the <br /> listing status of the species present.These <br /> o consultations shall determine appropriate <br /> � mitigation measures for any populations that <br /> would be affected by the implementation of <br /> C- the proposed project.Appropriate measures <br /> may include the creation of off-site <br /> populations through seed collection or <br /> transplanting,preservation and enhancement <br /> EO <br /> _ Mof existing populations,or restoration or <br /> �n M creation of suitable habitat in sufficient <br /> quantities to compensate for the impact. <br /> California Red-Legged Frog Before construction SJCOG,in <br />