My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006458
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0600644
>
SU0006458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 10:17:50 AM
Creation date
9/5/2019 10:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006458
PE
2637
FACILITY_NAME
PA-0600644
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209450014 15
ENTERED_DATE
3/1/2007 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
2/26/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0600644\SU0006458\IMP PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Km <br /> a <br /> a' College Park at Mountain House Specific Plan III <br /> 0 <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> n ► Before project activity,USFWS shall be consultation with <br /> rn consulted to determine whether widening of USFWS <br /> O Grant Line Road has potential to adversely affect <br /> California red-legged frog.It may be necessary <br /> ca to conduct a formal habitat assessment and <br /> osurveys to make such a determination. If it is <br /> c� determined that adverse effects are unlikely to <br /> occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required: <br /> Specific mitigation measures would be developed <br /> during the consultation process.Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.These may include limiting <br /> activities to certain seasons,minimizing <br /> CD vegetation removal and in-water construction <br /> activities,conducting pre-construction surveys, <br /> and conducting daily surveys and monitoring of <br /> construction areas.If necessary,appropriate <br /> compensation for loss of habitat and other adverse <br /> v effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> habitat and creation of additional habitat. <br /> CD c <br /> Swainson's Hawk Before construction SJCOG,in <br /> e C/) < If project construction begins during the (surveys shall be consultation with DFG <br /> Swainson's Hawk nesting season,as defined by conducted 2 weeks <br /> n DFG(March 1 to September 15),pre-construction prior to construction <br /> o surveys shall be conducted in areas of suitable activities) <br /> nesting habitat within 0.5 mile of project activity. <br /> ' = Surveys shall be conducted by a qualified <br />
The URL can be used to link to this page
Your browser does not support the video tag.