Laserfiche WebLink
cn 0 <br /> m o <br /> m rn College Park at Mountain House Specific Plan III <br /> v Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> o Mitigation Measure Timing/Schedule <br /> Responsibility Action Date <br /> Completed <br /> land uses,the operation of on-site landscape <br /> o maintenance equipment shall be limited to the <br /> least noise-sensitive periods of the day,between <br /> CD the hours of 7:00 a.m..and 10:00 p.m. <br /> U) <br /> m 4.13-3 Noise—Increased Traffic Noise After construction SJCCDD,in <br /> Q. <br /> The project applicants shall implement the measures conjunction with the <br /> 0 identified below. developer <br /> CO <br /> < Before occupancy of the fust residence at <br /> College Park,a noise barrier shall be constructed <br /> by the College Park developers between the Eve <br /> existing residences located on the north side of <br /> Grant Line Road between Central Parkway and <br /> C." the AIameda County line(Receptor 14 in Figure <br /> 4.13-2 of the EIR)and the northern travel lane of <br /> Grant Line Road.The noise barriers may consist <br /> of a wall,berm,or combination thereof.The <br /> exact location,height,and character of the noise <br /> r.: <br /> barrier shall be determined by a noise consultant <br /> a� <br /> approved by the County.The sound barrier shall <br /> o reduce outdoor noise levels at the center of the <br /> front yards of the Eve existing residences to <br /> o below 65 dBA LdnICNEL. If Grant Line Road is <br /> g widened at this location subsequent to <br /> construction of the sound barrier but before <br /> removal of the five residences under Specific <br /> CL Plan I1,the sound barrier shall be relocated,as <br /> X required.If the five existing residences are <br /> CD <br /> removed under Specific Plan II before occupancy <br /> of the first residence under the College Park <br /> `n project,this mitigation measure shall not require <br /> v <br /> 3 rn implementation.This mitigation shall be funded <br /> y through fair-share payments by the College Park <br /> 3 developers. <br />