Laserfiche WebLink
E: m <br /> r. a <br /> College Park at Mountain House Specific Pian III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> S. Mitigation Measure Timing/Schedule Responsibility Action Date <br /> c� Completed <br /> 4.134 Noise—Compatibility of Proposed Land Uses After construction SJCCDD,in <br /> exceeding Predicted Noise Levels conjunction with the <br /> CD <br /> The College Park developers shall implement the developer;in <br /> following measures: consultation with a <br /> m < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> 0 <br /> the first residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> 3 segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm,or combination thereof.The exact location, <br /> w height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> on proposed adjacent single-family residences to <br /> below 65 dBA L"/CNEL and as close to 60 dBA <br /> cn L&ICNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> RL College Park developers. <br /> a� <br /> K <br /> 0 <br /> c <br /> w <br /> v � <br /> 0 ro <br /> � U) <br /> 0 -0 <br /> M m <br /> a C.) <br /> c. <br /> 0 <br /> C7 � <br /> o � <br /> -a = <br />