My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006458
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0600644
>
SU0006458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 10:17:50 AM
Creation date
9/5/2019 10:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006458
PE
2637
FACILITY_NAME
PA-0600644
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209450014 15
ENTERED_DATE
3/1/2007 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
2/26/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0600644\SU0006458\IMP PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T. <br /> Special Pinpose Plan C'.assano K•arnil€3s Homes at colle-e Park <br /> SECTION SEVEN: IMPLEMENTATION <br /> 7.1 Introduction <br /> Providing flexibility to refine the project throughout the process, so long as <br /> Performance standards set forth above are met, is an important component of this <br /> Special Purpose Plan. <br /> 7.2 Refinement of Project Elements During Construction <br /> In order to create the best possible project, it is expected that the siting of project i <br /> elements such as, but not limited to,houses, guest parking spaces,private patios <br /> and pedestrian path locations will be checked and adjusted as appropriate in the <br /> field prior to construction. <br /> 7.3 Amendments to this Special Purpose Plan <br /> Minor modifications to this Special Purpose Plan may be permitted by the <br /> Community Development Director without formal Plan Amendment,provided <br /> such modifications do not violate or adversely impact other elements of the <br /> Special Purpose Plan. Said modifications shall be approved by the Design <br /> Consistency Review Committee (DCRC). <br /> F <br /> 7.4 Phasing <br /> I. Project residential areas may be developed in phases, subject to utility and <br /> access requirements, as determined by MHCSD. <br /> 2. The Linear Park in the project area may be developed in two phases, North <br /> and South,with the division at Teixeira Avenue. Improvement of the Linear <br /> Park segments shall be as follows: <br /> a. Construction of the North shall begin by the time that 50%of the building <br /> permits for sub-neighborhoods D2 and D4 have been issued. <br /> b. Completion of the North shall occur by the time that 80% of the buildings <br /> in sub-neighborhoods D2 and D4 have been issued occupancy permits. <br /> c. Construction of the South shall begin by the time that 50% of the building <br /> permits for sub-neighborhoods D3, D5 and D6 have been issued. <br /> d. Completion of the South shall occur by the time that 80% of the buildings <br /> in sub-neighborhoods D3, D5 and D6 have been issued occupancy <br /> permits. <br /> Fal;{."ASSA'it.)KAi.-!]TOS WYVIFS,'F, PARK <br />
The URL can be used to link to this page
Your browser does not support the video tag.