Laserfiche WebLink
Coes Park at MonntOn House Speeine Plan M <br /> Mf#igation Monftoring and Reportfag Program <br /> at Implementation implementation&Ver kation <br /> Mitigation Measure TiminglScheduie Responsibilty Won Data <br /> Completed <br /> biologist widgu the 2 weeks before copstruction <br /> �C or tape removal begins.If no active nests are <br /> found,Ao furdw.mi�igation shall be.required. . <br /> < If`active nests we found,b acts shall be <br /> avoided by esta4sklment of appopriafa ers- <br /> No project acti'Vity,shall commence vsrithiat the <br /> buffer area until a qualified biologist con <br /> that the nest..is no longer active DFG guidelines <br /> _ imPlOn of 0.25-or 0.5-mile <br /> buffers,but the size of the buffeF may be adjusted <br /> if.a quaffed biologist and DFG determine-it <br /> would not be likely to adversely affect the Best. . <br /> Monitoring of the nest by a qualified biologist <br /> maybe required if the activity has potential to <br /> adversely i6d the nest. <br /> Burrnwisg Owl Before construction STCOG,in <br /> < Befke project actevitl►,focused surveys for. consultation with DFG <br /> beurowing owls shall be conducted by a qualified <br /> a� biologist inertias of suitskge.habitat.on apd. <br /> within 250 Ecce of the project site.Surveys shall <br /> be conctod m accordaace with DFG protocols <br /> C�i:G 1995)- <br /> < If no.occupied burrows am found in the.survey <br /> RIM a iter,report survey methods <br /> and finftzs:shall be.x4mO#oil to DFG,and no <br /> fiuther mitigation is nary.. <br /> < If an occupied burrow with an active nest is <br /> found,impacts shall be minimized by <br /> establishing a 250-foot buffer area around the <br /> burrow.No project activity shall occur within the <br /> M buffer area until a qualified biologist confirms <br /> that the nest is no longer active.The sim of the <br /> buffer area may be adjusted if a qualified <br />