Laserfiche WebLink
° College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implernentation&Verification <br /> Miftation Measure 7hingWedule .Responsibility Action pate <br /> Completed <br /> biologist and DFG dewroina:it wmtdd not be <br /> likely to adversely affect tW nesting pair.DFG <br /> sbaU also be consultod to.d ace if it is <br /> necessary to temporarily preserve foraging <br /> habitat(in addition to the buffer area)until the <br /> M nest is no longer active. <br /> < If feasible,250-foot buffer areas.shall also be <br /> established around all other occupied burrows.If <br /> this is not feasible,DFG shall be consulted to <br /> dem whether smaller buffer areas andlor <br /> relocation oaf owls is necessary.Relocation may <br /> include passive techniques,such as use of one- <br /> way doors to encourage owls to move to <br /> alternative barrows outside the impact area,or <br /> capture and movement of owls to specific <br /> 'mitigation sites. <br /> Other Nestipg Raptors Before constriction SICOG,in <br /> < If project construction begins during the raptor (surveys shall be consultation with DFG <br /> nesting.season(Fabruary 15 to August 31),pre- conducted 2 weeks <br /> construction surveys shall be conducted by a prior to construction <br /> qualified biologist in areas of suitable nesting activities) <br /> habitat within$00 feet of project activ*.Surveys <br /> stall be conducted within 2 weeks before tie . . <br /> beginning o£construction.or t=removal.If no <br /> active nests are found,ao fir dw mitigation shall <br /> be reqWtvI <br /> < Ifactive nests we found,impacts shall be avoided <br /> by establishment of appropriate buffers.No <br /> project activity shall commence within the buffer <br /> area until a qualified biologist confirms that the <br /> nest is no longer active.DFG guidelines <br /> recommend implementation of 500-foots, <br /> but the.size of the buffer may be adjusted if a <br />