My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006459
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0600645
>
SU0006459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 10:05:38 AM
Creation date
9/5/2019 10:45:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006459
PE
2620
FACILITY_NAME
PA-0600645
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209450014 15
ENTERED_DATE
3/1/2007 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
2/26/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0600645\SU0006459\IMP PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
° College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implernentation&Verification <br /> Miftation Measure 7hingWedule .Responsibility Action pate <br /> Completed <br /> biologist and DFG dewroina:it wmtdd not be <br /> likely to adversely affect tW nesting pair.DFG <br /> sbaU also be consultod to.d ace if it is <br /> necessary to temporarily preserve foraging <br /> habitat(in addition to the buffer area)until the <br /> M nest is no longer active. <br /> < If feasible,250-foot buffer areas.shall also be <br /> established around all other occupied burrows.If <br /> this is not feasible,DFG shall be consulted to <br /> dem whether smaller buffer areas andlor <br /> relocation oaf owls is necessary.Relocation may <br /> include passive techniques,such as use of one- <br /> way doors to encourage owls to move to <br /> alternative barrows outside the impact area,or <br /> capture and movement of owls to specific <br /> 'mitigation sites. <br /> Other Nestipg Raptors Before constriction SICOG,in <br /> < If project construction begins during the raptor (surveys shall be consultation with DFG <br /> nesting.season(Fabruary 15 to August 31),pre- conducted 2 weeks <br /> construction surveys shall be conducted by a prior to construction <br /> qualified biologist in areas of suitable nesting activities) <br /> habitat within$00 feet of project activ*.Surveys <br /> stall be conducted within 2 weeks before tie . . <br /> beginning o£construction.or t=removal.If no <br /> active nests are found,ao fir dw mitigation shall <br /> be reqWtvI <br /> < Ifactive nests we found,impacts shall be avoided <br /> by establishment of appropriate buffers.No <br /> project activity shall commence within the buffer <br /> area until a qualified biologist confirms that the <br /> nest is no longer active.DFG guidelines <br /> recommend implementation of 500-foots, <br /> but the.size of the buffer may be adjusted if a <br />
The URL can be used to link to this page
Your browser does not support the video tag.