Laserfiche WebLink
C o <br /> � n <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/ScheduleResponsibility Action Date <br /> Completed <br /> °1at least 5 consecutive days from the time of the <br /> � observation,to allow any ldt,fox occupying the <br /> den to move.to aniAer*ation.If it is not a natal <br /> or pupping den,use of the den can be discouraged <br /> &mg this Period by partially plugging its <br /> entrances)with soil in such a manner that any <br /> animal can escape easily.The den may be <br /> destroyed when,in the judgment'of a qualified <br /> biologist,it.is no'longer occupied by a kit fox or it <br /> is temporarily vacant.Methods for den destructio <br /> shall be in accordance with USF_ WS <br /> recommendations. <br /> c < Occupied natal or pupping dens shall not be <br /> destroyed until the adults and pups have vacated <br /> the den and then only after consultation with <br /> USFWS.A 250-foot buffer zone shall be, <br /> maintained around natal dens until the biologist <br /> deterlaa roes that the den bas been vacated. <br /> °m Additional Provisions of the Standardized. . . <br /> Becommendations for Protection ofthe fan <br /> Joaquin Kit Fax Before or During Ground <br /> .,Wturbance.([TSFWS 1999),including those <br /> for educating construction workers regarding <br /> kit fox,keeping heavy equipmoit operating at <br /> safe speeds,and chw1ung eaonstarwdon pipes <br /> for kit fozon, <br /> �n during.consttucd <br /> shall also be implemented. <br /> Jurisdiedongi Waters of the United States Before Construction SJCOG,in <br /> < The College Park Developers shall implement coordination,with. <br /> Mitigation Wtsure 4.10-10. DFG,USACE and/or <br /> RWQCB <br /> 4.11. TRAFFIC <br /> 4.11-1 Transportation—Effects on 2025 Cumulative Before construction San Joaquin County <br />