Laserfiche WebLink
College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Ot Mitigation Measure TiminglSdtedule InvWWtation Responsib Acton Dai <br /> ICompieted <br /> With-Project Conditions an Anticipated Network <br /> For cowisk mcy with previously,adopted roadway <br /> standards,tate Cou*y shall oxtmd the standard of <br /> LOS D to the segment of Byron Road cast of .grant <br /> Line Road <br /> Because Byron Road is a major regional arterial <br /> sem.the area,the County shall vdwd <br /> ihan of Mountain House Master Plan <br /> }.BIR,mit}gation.measure 4.12-5{e}to appy to <br /> Byrolt.Road east of Carat Lia'Road <br /> 4.12. AIR:QUALITY <br /> C.0 4.12-1 Air Qwdity--Generation of.Temporary,Short- Before construction SJVAPCD,in <br /> Term Canstruction Emissions of Criteria Air begins and during conjunction with the <br /> Pellutatnfs construction developer <br /> The College Park developers shall implement the lates <br /> version,of the SJVAPCD . sions <br /> eon t+ol-messures during construction(see."Regulatory <br /> �- Settit!$,",.above). <br /> °Q The latest verb of tlw San Ioaqum Valley Air <br /> Polhttaom C�r+ol Det(SIYA,PM) l <br /> measures aye included in thn Grdde for Assemft and <br /> MitigatutgAirQerality7mpaW(SJVAPCD 1998)and <br /> . repeated in*"Regulatory Seim' .Tire <br /> SJVAPCD periodically res control rtu�es. <br /> Development under College Park would be required by <br /> the SNAPM to implement the cumnt xersion of the <br /> measures at the time individual,development <br /> applications are received by the County for <br /> development under College Park. <br /> 4.12-2 Air Qua>ity*—Potential Generation of Toric Air Before construction SJVAPCD,is <br /> g o Contaminants(TACs) begins and during conjunction with the <br /> g ► Asbestos—The College Park developers shall ccinstruction developer <br /> implement Mitigation Measure 4.9-1. <br />