Laserfiche WebLink
Callus Park at Mountain House Spee flc Plan III <br /> ~on Monitoring and Repordag Program <br /> Implementation&Verification <br /> R Mitigatlon Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> Completed <br /> 4.13. NOLSE <br /> 4.13-1 Noise---Generation of Tengwrary Construction During construction SICCDD,in <br /> Noise. conjunction with the <br /> C < t project construction activities to the hours developer <br /> between 600 am.and 900 p.m. <br /> < Cady San Joum County <br /> Devel�'if . fbi all'congtructiotE activities. <br /> < sill oonsguctioi vehicles or equipment,flied " <br /> F. <br /> or wow,wvith'properly operating and <br /> maintained mutllers and acoustical shields or <br /> Arouds,in accordance with xnww actureis` <br /> recommendations. <br /> < Arrange all fiction equgaf and truck <br /> routes to Minitnize travel adjacent to occupied <br /> reod" <br /> < Locate statto=y construyction equipment and <br /> staff".0 as far as stole from sensitivereceptors.Te04KWary acoust q barriers,may be <br /> Wkdlcd a stationary egiup nt,if <br /> 4.13-2 Nd" eneradon of New Stadonxrr-So" During design phase SJCCDD,in <br /> Noise and during conjunction with the <br /> 17he project applicants shall incorporate the measures construction developer <br /> idtntified below initis the project design. <br /> CommercK Office,and LtdnsrMal Uses , <br /> ID Industrial and commercial land uses proposed as'part <br /> of the College Park project shall.be designed to <br /> ensure that out .pq*=t does not result in an <br /> exceedance of 55 dBA L q dotting daytime hours <br /> p (7:00 am to 10:04 p.m.)or 50 dBA I,q during <br /> nighttime hours(10:00 p.m.to 7:00 a.m.)at off-site <br /> noise-sensitive receptors.In addition,design and <br />