Laserfiche WebLink
� m <br /> � a <br /> College Park at Mountain House SpeMe Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implerrte�tation Implementation&Verification <br /> Mitigation Measure TiminglSchedule Responsits* Accton Date <br /> Completed <br /> ► Mobile-Source TAC Emissions—The College <br /> Park applicants for hx u bW or cone=al land <br /> uses.slaall coordinate with the SJVAPCD to . <br /> assess situations inn wbmh toxic risk from diesel <br /> particulate matter(Pbo many,occur and to review <br /> methodologies that may become available to <br /> estimate the risk..The,develgpers shall.imple;ment <br /> any 1roje -level measures.adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> cmissians. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional - Before and during SJCCDD,in <br /> Exposure of Nero Sensitive Uses to Odors construction conjunction with the <br /> N The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> exubug on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> refuse piles are removed. <br /> c 4.12-5 Air Quality—bwreased Lang-Term Regional Before construction SJVAPCD,in <br /> Emissions of Criteria Pollutants begins and during conjunction with the <br /> 114 College Park developers shall implement all of construction developer <br /> the mitigation measures as recon in the <br /> Guide for Assessing and Mi gating-Air Quality: <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> are&lmdy.inchxW in the proppsed.pr+oject design <br /> andt"are already required by the MMe and by <br /> mitigation in the M e and Deft College EUU.. <br />