Laserfiche WebLink
College Park at MountaIR House Spedfle Pian III <br /> Melon Monitoring and Reporting Program <br /> RL <br /> Implementation Implementation&Verification <br /> Mitigation Measure TiminglSchedule ResponstU14 Action Data <br /> Completed <br /> 41 LAND USE <br /> 4.2-1 Lapd,U.se and Agrleulture- Conflict with ExW ft Beforeand denting San Joaquin County <br /> Land,UOU construction,and Coininunity <br /> The College Park developers shall implement the Dining design phase Development <br /> following. easures: Department <br /> < Fence off the two on:site:Byron-Bcthany. (SJCCDD),in <br /> Itrigation DiAnct(BBIP)canals from proposed conjunction with the <br /> urban development until such time as the canals developer,and in <br /> are tilled.The fencing.shall be sufficient to block.. coordination with <br /> access to the amok by-all'except BBID BBID <br /> peiSOMael and other Authorized pdsow,.end shall <br /> be develepeil in coordination with BBID to <br /> ensure that BBID haus 6ontinued access to the <br /> cads for maintenance activities. <br /> < In plament Mitigation Measure 4.9-5,identified <br /> in Section 4.4,"Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from,time natural <br /> gas pipelines within the PCa& --Chevron . <br /> easeutmeat that bisects the prpject site. <br /> < Idantify.•an agricultural buffer of no less than 100 <br /> feet at.the time of Tentative Map Viral for <br /> any new units in the residential area in and south <br /> of Grant Line.Village and.adjacent to the County <br /> lim <br /> M <br />