Laserfiche WebLink
M <br /> g <br /> College Park at Mountain House Speeiiic Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Impl�nentation&Verification <br /> Date <br /> Mitigation Measure Timing/ScheduleResponsibility Action Completed <br /> 4.2-4 Land Use and Agrieuttare--Conflict Substantially After discontinuance SJCCDD,in <br /> with Fakting Agricultural Zoning or Williamson of interim land conjunction with the <br /> Act Contracts disposal. developer <br /> The project applicants..sball.implewent.the following <br /> mitigation measure: <br /> < At such time as the interim landIdisposal of <br /> treated wastewater at the Pombo pooperty is <br /> discontinued,GNK,LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e.,feed crops). <br /> 4.2-5 Land Use and Agriculture—�Contlicts with Before construction SJCCDD,in <br /> Adjacent`Agriculturat Operations conjunction with the <br /> 4 < Before development;the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> water from the canals by the installation of <br /> an pipelines and"other means.The filling of the <br /> irrigation canals shall be approved by BBID. <br /> 4.6 CULTURAL RESOURCES <br /> 4.6-2 Cultural Resources--Potential During construction SJCCDD,in <br /> °- DestruetiouMamage to.Undiscovered Cultural conjunction with the <br /> Resources developer,and in <br /> if discovery of.unknown cultural materials is made conjunction with <br /> a during 6onstr6ction,ground-dist nbing activities at qualified . <br /> ::rbe <br /> t ion sitewhere the dwavery was made archaeologist,if <br /> halted."The College Park developers or needed. <br /> construction contractor shall contact the San Joaquin <br /> County Community Development Department <br /> (SJCCDD)immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> noised and retained by the College Park developer. <br /> The archaeologist shall determine whether the <br /> resource represents a`unique archaeological <br />