Laserfiche WebLink
Ko <br /> a <br /> College Park at Mountidu House Specific Pian III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure TlminglSchedule Responsibility Acton Date <br /> Competed <br /> 4.6-3 Cultural Resources--Potential to Uncover Human During construction SJCCDD,in <br /> Remains conjunction with the <br /> In accordance with the California Health and Safety developer,and in <br /> Code,if human remains are uncovered during ' conjunction with <br /> CE construction at the project site,the College Park qualified archaeologist <br /> developer or construction contractor shall immediately and County Coroner, <br /> halt potentially damaging excavation and notify if needed. <br /> SJCCDD.The County shall,in turn,immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> CO 7050.5[b]).If the coroner determines that the remains <br /> are those of Native American,he or she shall contact <br /> the Na{iiie American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> determination(HSC Section 7050[cj).dace A'?Aost <br /> Likely Descendent(MLD)has been designated by the <br /> NAHC,the MLD,in consultation with the County, <br /> shall determine the ultimate disposition of the remains. <br /> ' The responsibilities of the County for acting upon <br /> notifibation of a discovery of Native American human <br /> remains are oared in detail in the PRC Section <br /> .5097.9.Measur6i likely resulting from the above . <br /> could inchule preservation.m place and <br /> cappinglavoidance,orremoval and continued <br /> monitoring of ground-disturbing activities. <br /> cS 4.7 DRAINAGE <br /> 4.7-2 Drainage—Result in Flooding or Exceed the Before construction MHCSD,in <br /> Capacity of the Storm-drain System conjunction with the <br /> The College Park developers shall expand WQB 1 as developer <br /> required to accommodate runoff from the College <br /> Park project,or shall provide the required on-site <br />