Laserfiche WebLink
College Park at Mountain House SpeMe Plica III <br /> Mitlgaflon Monitoring and Reporting Program <br /> Implementation&Verification <br /> Mitigation Measure TiminglSc:hedule ImplementationResponsibility action Date . <br /> 3 Completed <br /> �• retention in lieu of the required expansion of WQB 1, <br /> before.development of those portions of <br /> Neiglods B and D to be served by the DeAnza <br /> Boulevard and Mountain House Parkway storm-drain <br /> Sysaems�x.. <br /> 4.8 WATER QUALITY <br /> 43-1 Whit QWdJ" -�Potentlal Temporary NOI(s)submitted to MHCSD,in <br /> CondrWdon-Related Water Quality Effects the Central Valley conjunction with the <br /> The College Park developers shaR consult with the RWQCB before developer,and in <br /> Central Valley Regianel Water Qualify.Control Board beginning of coordination with the <br /> (RWQCB)to acquire tete appropriate regulatory applicable ground Central valley <br /> approvah that maybe necessary to obtaim'Section disturbing or RWQCB <br /> 401 wa#erquality certification,ensure compliance dewatering activities; <br /> with tate State Water Resources Control Board water quality <br /> (SWRCB)statewide National Pollutant Discharge performance <br /> Elimination System(NPDES}gmumater permit for standards established <br /> general emotion activity and the Central Valley before construction <br /> RWQCB NPDES permit for construction dewatering begins <br /> activity,and obtam any other necessary site-specific <br /> WDRs or waivers.issued pursuant to the Porter <br /> Cologoe,Act.As required render the NPDES <br /> stormwater permit br gaaal onstruction activity, <br /> the project applicant shall prepare a Sk mwater <br /> Pollutioa,P111 Plan(SWPPP)and any.other <br /> necesaary.enginQaing plans and specificWons for <br /> pollution prevention and control.The SWPPP and <br /> other appropriate pleas shall: <br /> a < Identify and specify the use of erosion and <br /> sediment control Best Management Practices <br /> (BMPs),means of waste disposal, <br /> implementation of approved local plans,non- <br /> stornnwater management controls,permanent <br /> postconstruction BMPs,and inspection and <br />