Laserfiche WebLink
M <br /> -0 <br /> °. College Park at Mountain House Specific Plan III <br /> 3 Mitlgation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> MMgabon Measure Timing/Schedule Responsibility AcOon date <br /> Completed <br /> maintenance responsibilities; <br /> < Specify the pollutants that are I ely to be used <br /> fluxing conatn�ctivn that could be present in <br /> storwwater drainage and non-stormwateer <br /> +b discharges, <br /> < Specify BMP inspection protocols to ensure that <br /> the BWs are effective and ensure that the <br /> monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into.stormwater, <br /> < ldentiifjr,co mMnxtian techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> measures to be impleneated; <br /> < Specify spill mon and contingency <br /> < Identify the types of mati&Ws used for <br /> equipment operation; <br /> < Identify measures to prevent or clean up spills of <br /> ,u hazardous materials used for equipment <br /> operation and hazardous waste; <br /> < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> subsequent site-developtnent.activities; <br /> < Idenfify personnel training requirements and <br /> procedures that will.be mead to ensure that <br /> workers are aware of permit,requirements and <br /> proper installation and performance inspection <br /> methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> supervisory duties related to implementation of <br /> the SWPPP;and <br /> < Require all construction contractors to retain a <br />