Laserfiche WebLink
Km <br /> , v <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&VedcaWn <br /> Mitigation Measure TiminglSc;hlldEtle Responsibility p�� Dai <br /> Completed <br /> are capable of independent survival,the <br /> burrow can be destroyed. <br /> 4.10-6 Biological Resources—Converdonof Common Before and during SJCCG,in <br /> Nesting Raptor Habitat and Possible'Lnss of construction consultation with DFG <br /> M Active Nest <br /> < The College Park developers shall request <br /> coverage under the SJMSCP,and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> j throughout much of the College Park site,but are <br /> CO concentrated along Grant Line Road and at Grant <br /> Line Village.Suitable nesting habitat for <br /> northem harrier is provided by all field crops and <br /> Wow fields.During the SJMSCP application <br /> process,SJCOG will determine whether that <br /> specific project site supports suitable nesting <br /> habitat.If SJCGG determines suitable habitat is <br /> ,} present on or adjacent to a given project site,the <br /> SJMSCP incidental take avoidance and <br /> minimization measures described below for <br /> g raptors shall beiwplemmted.Additional <br /> yes below.shall be implemented to avoid <br /> loss of active nests of common raptor species, <br /> which are not covered under the SJMSCP but are . <br /> protected under the California Fish and Cisme <br /> Code.The project applicants shall retain <br /> qualified biologists to conduct all pre- <br /> construction surveys. <br /> < White-talled Kite.If project construction begins <br /> during the nesting season(February 15– <br /> = September 15),pre-construction surveys shall be <br />