Laserfiche WebLink
College Parr at Mowdain House.Spedfk Plan M <br /> limon Monitoring And Reporting Program <br /> Implementation&Verification <br /> Mitigation Measure Timing/Schedule implementation Date <br /> Responsibility. Action Completed <br /> conducted to investigate all potential nesting <br /> trees on the project site(e.g•,especially tree-tops <br /> 15-59 feet above the ground in oak,willow, <br /> etuxtlyptus,cottonwood,or oto`"duous <br /> GO #roes),wl ever white-tailed kites are,noted on- <br /> site or within the vicinity of the site during the <br /> nw6j season.A setback of 100 feet from white- <br /> tailed kits nesting areas sbotll be established and <br /> maiutainedduring the nesting season for the <br /> period ; ins nest building and <br /> fledglings leave nests.This <br /> setback°applies whenever cadistruddon or other <br /> gnouttil-disteti%ng wtivides must begin during <br /> the nesting season in*e pie of nests that <br /> Are known to be occaupie&Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < Northern Hurler.ff pi'ved construction begins <br /> during the nesting season(February 15—August <br /> 31),pre-construction surveys.sW be conducted <br /> during the'nesting season in suitable nesting <br /> habitat within 500 fact ofwas of project <br /> activity.The survey sball be conducted within <br /> the 2 weeks before construction begins.A <br /> setback of 500 feet from northern[harrier nesting <br /> areas shall be estahad and mai:ntaiued during <br /> the fist season for the period encompassing <br /> nest building and continuing until fledglings <br /> leave nests.This setback applies whenever <br /> construction or other ground-disturbing activities <br /> must begin during the nesting season in the <br /> presence of nests that are known to be occupied. <br /> nSetbacks shall be marked by brightly colored <br /> temporary fencing. <br /> < Common Raptors.If project construction begins <br />