Laserfiche WebLink
x M <br /> College Park at Mountain Hoose Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification Date <br /> A6itigatiai Measure Timing/ScheduleResponsibility Action <br /> compiew <br /> during the'nesting season(February 15—August <br /> 31),pre-oonstmctioh'surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> �} habitat within 500 fat of areas of project <br /> a$ activity.The survey shall be conducted within► <br /> the 2 weeks before construction or tree removal <br /> begins.If any active nests are found,a setback of <br /> 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> o ground-dishtrbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied.Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 410-7 Biological Resources--Conver don of Other Before construction SJCOG,in <br /> Special-Statues Nem Bird Habitat and Possible (surveys shall be consultation with DFG <br /> Lass of Active Nesta conducted 2 weeks <br /> The College Park developers shall request coverage prior to construction <br /> under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCQG during the application <br /> and review process for each project under College <br /> Park.During the S7MSCP application process, <br /> SJCOG will determine whether that specific project <br /> site supports suitable habitat for loggerhead shrike, <br /> California horned lark,or tricolored blackbird.If <br /> SJCOG determines suitable habitat is present on or <br /> adjacent to a given project site,the following <br /> SJMSCP incidental take avoidance and minimization <br /> M measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> < Loggerhead Shrike.If project construction <br />