My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006459
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0600645
>
SU0006459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 10:05:38 AM
Creation date
9/5/2019 10:45:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006459
PE
2620
FACILITY_NAME
PA-0600645
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209450014 15
ENTERED_DATE
3/1/2007 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
2/26/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0600645\SU0006459\IMP PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> v <br /> College Park at Moutltain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure TiminglSchedule Responsibility Action Date <br /> Completed <br /> Kit Foz Habitat and Possible Occupied Den (surveys shall be consultation with DFG <br /> Destruction conducted 2 weeks to <br /> The College Pafle developers shall request coverage 30 days before <br /> under tho SJMSCP,aid"fees shall be paid in the construction <br /> amount debermin d by San Joaquin CtSut ty of activities) <br /> "d Government(SJCOG)during the application anal <br /> review process for each project under College Park. <br /> Becausee entire College Park site is located within <br /> the SJMSCP's CentmllSouthwest Transition Zone,the <br /> following SJMSCP incidental take avoidance and <br /> minimization measures shall be iupler6entedlbi� all <br /> project: <br /> N < Pre-construction surveys shall be conducted 2 <br /> weeks'to 30 days before commencement of <br /> ground disttabance.Surveys shall be,conducted <br /> by a qual Pied biologist.If the surveys identify <br /> potential dens(poft ial bens are defined as <br /> burrows at least'4 ihches'in diameter that open up <br /> within 2 feet),potential den entrances shall be <br /> dusted for 3 calendar days to register track of any <br /> San Joaquin kit fox present.If no San Joaquin kit <br /> It fox activity, identi5ed,potential dens May be <br /> destroyed.If Sari Joaquin kit fox activity is <br /> idled,hien'dens shall be monitored to <br /> detenmpiie itoccupation is by'an adult fox only or <br /> is a iuital den(natal'delis usually bave 69 iple <br /> openings) If the den,is,occupied by am adult only, <br /> tite den may be destroyed when the adult fox as <br /> moved or is temporarily absent If the den is a <br /> �. natal den,a buffer zone of 250 feet shall be <br /> maintained around the den until the biologist <br /> determines that the den has been vacatod� <br /> < Where San Joaquin kit fox are identified,the <br /> provisions of the&w dardized Recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.