Laserfiche WebLink
CoN*Park at Mountain House SpedBe Plan III <br /> Mfflgntion Monitoring and Reporting Program <br /> Implementation&Vertkation <br /> Mitigation Measure Timing/Schedule Implementation Dale <br /> Responsibility Action <br /> Canpleted <br /> frir Pwkrdoa of the San Joaq=Kit Fox Wore <br /> or durMg Gmmd DuWrbartce(US Fish and <br /> Wildlife Service(FWS] 19996)shall apply <br /> (Ciceapt.brat� siuvoy protocols <br /> shsllzenowauxassst$hliEsho�a�;#he abos�e <br /> paragraph).These stitahuxis include, for <br /> eduppatmg construction Workers regudin <br /> fo i� uip�ment o at see <br /> cher ca�ruchm for,ldt;fox <br /> spends, S' prpe$., <br /> occupation du4g constrion,and similar low- <br /> or.ung-cost active. <br /> 4.10-10 Biolo&al Rasources--�or At6watil of Before construction SJCOG,in <br /> w Jarilsdidiand VAdeea of the United States coordination with <br /> Impacts to w of the U ,. arenot currentlyDFG,USACE and/or <br /> mitigated by man in the SJMSCP.Therefore, RWQCB <br /> the CollG�b*-deveJopers shall implemgntthe <br /> following, • <br /> < Before imptiori of any Tentative Map or <br /> m develop er t t(if nn.Tenwive M under <br /> dW ColleP PR*-PNjOCt,a fOMW SetiQA 4N <br /> ddiiiiwaiion.of wat xe of dw United States, <br /> nchAng wetlands,shall be cotaducted.by a <br /> qualified bh ist in dw TeaRtive Map of <br /> davOopmat plied am if dw area includes <br /> features tbat arepscatially subjectto United <br /> States Ary Corp of Enpum(USACE) <br /> junsdietilon(ponds,kriSation canals,and <br /> drainages).The delineation shall be submitted to <br /> USACE for verification. <br /> al < If,based on the verified delineation,it is <br /> M detem fined that fill of waters of the United States <br /> would result from the Tentative Map or <br /> development project,authorization for such fill <br />