Laserfiche WebLink
M <br /> a <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Impiemenb&n Implementation&Verii radon <br /> Mitigation Measure TiminglSchedule Responsibility mon Date <br /> Completed <br /> shall be secured Win USACE via the Section 404 <br /> process before,implementation of the <br /> entative Map or development 1�J�- <br /> < A,--D-FG Streambad Altmtioa Agreement and 40.1 <br /> Water Quality Certification may also be required <br /> for fill of the irrigation canals.and the ephemeral <br /> (College)drainage.DFG.W"be consulted to <br /> determine if a Streambed Alteration Agreement is . <br /> required.If USACE does not take jurisdiction <br /> over the,irrigation canals or drainages,the <br /> RWQCB shall be consulted to determine if a 401 <br /> Water Quality Certification is required. <br /> < The ameago of waters of the United States that <br /> would be removed shall be replaced or <br /> restoredienhanced.by the developers on a"no-net-. <br /> foss"basis in accordance with USAGE and DFG <br /> regulations.Habitat restoration,enhancement,or <br /> replacement shall be at a location and by methods <br /> agreeable to USAGE and DFG,as determined <br /> 70 during the Clean Water.Act(C"WA)Section 404 <br /> and California Fish and Game Code Section 1602 <br /> pGrnxitting prncesses.. <br /> 4.10-12 BiologW Ne-FAkta on See mitigation See mitigation <br /> BiolooW Resoureea front don-ofOff- 'measures 4.10-5, measures 4.10-5,4.10- <br /> Site Infrastructure IImprovenmo 4.10-6,4.10-6)4.10-7, 6,4.10.6,4.10.7,4.16- <br /> San <br /> ,4.10-6,4.10-7,4.10- <br /> San deaqulwCounty.For dwse off-cite 4.10-8,4.10-9,and 8,4.10-9,and 4.10-10 <br /> m provernenW proposed in Sam Jca qu in Cowty,-dw 4.10-10 <br /> College Park developers shall implement Mitigation <br /> Measures 4.10.-5,4.10-6,4.10-7,4.10-9,and 4.10-10. <br /> Alameda County.For those off-site improvemcuts <br /> proposed in Alameda County,the College Pa& <br /> developers shall implement the measures identified <br />