Laserfiche WebLink
cn c� <br /> m o <br /> o``n College Park at Mountain House Specific Plan III <br /> CD Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Implementation �­O; MDalle' <br /> Mitigation Measure TiminglSchedule Responsibility Action 4 oeted <br /> T. 4.2 .LAND USE <br /> = 41-1 Land Use and Agriculture—Conflict with Existing Before and during San Joaquin County <br /> � <br /> Land Uses construction, and Community <br /> CU The College Park developers shall implement the During design phase Development <br /> Cf) Department <br /> following measures: <br /> r, <br /> < Fence off the two on-site Byron-Bethany (SJCCDD), in <br /> !unction with the , <br /> Irrigation District(BBID)canals from proposed con <br /> urban development until such time as the canals developer, and in <br /> _ are filled.The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons, and shall <br /> be developed in coordination with BBID to <br /> w ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5, identified <br /> in Section 4.9, "Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> gas pipelines within the PG&E–Chevron <br /> o easement that bisects the project site. <br /> < Identify an agricultural buffer of no less than 100 <br /> ofeet at the time of Tentative Map approval for <br /> o' any new units in the residential area in and south <br /> ' of Grant Line Village and adjacent to the County <br /> a, line. <br /> CL <br /> co <br /> 0 <br /> cfl <br /> o M <br /> ca p <br /> D <br /> 3 <br />