Laserfiche WebLink
Rzm <br /> xW Q <br /> co' <br /> oCollege Park at Mountain House Specific Plan IIT <br /> Mi#igation Monitoring and Reporting Program <br /> Mitigation Measure implementation Implementation&Verification <br /> Timing/Schedule <br /> m <br /> Responsibility . Action Date. <br /> n <br /> 4.2-4 Land Use and Agriculture—Conflict Substantially After discontinuance SJCCDD, in Completed <br /> with Use <br /> Agricultural Zoning or Williamson of interim land conjunction with the <br /> o Act Contracts <br /> disposal <br /> The project applicants shall implement the following developer <br /> E <br /> mitigation measure: <br /> 0 <br /> < At such time as the interim land disposal of <br /> treated wastewater at the Pombo roe is <br /> °} property�3' <br /> discontinued,GNK, LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond IV <br /> site to agricultural use(i.e., feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction SJCCDD, in <br /> Adjacent Agricultural Operations conjunction with the <br /> < Before development, the project developers shall <br /> developer, and in <br /> provide for-the continued provision of irrigation coordination with . <br /> water to downstream agriculture reliant on the BBID <br /> C-) water from the canals by the installation of <br /> pipelines and other means,The filling of the <br /> irrigation canals shall be approved by BBID. <br /> 4.6 CULTURAL RESOURCES <br /> 'c 4.6-2 Cultural Resources--Potential During construction SJCCDD, in <br /> m <br /> Destruction/Damage to Undiscovered Cultural conjunction with the <br /> O Resources <br /> Cdeveloper,and in <br /> If discovery of unknown cultural materials is made <br /> during construction, ground-disturbing activities at conjunction with <br /> z the construction site where the discovery was made qualified <br /> archaeologist, if <br /> C0 m shall be halted. The College Park developers or needed, <br /> C_ co construction contractor shall contact the San Joaquin <br /> (SCD County Community Development Department <br /> �• (SJCCDD)immediately, and a qualified professional <br /> on D archaeologist acceptable to County staff shall be <br /> notified and retained by the College Park developer. <br /> The archaeologist shall determine whether the <br /> resource represents a"unique archaeological <br />