Laserfiche WebLink
rn <br /> f t <br /> o' College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> E <br /> F Mitigation Measure Implementation Implementation&Verification <br /> Timing/Schedule <br /> Responsibility Action Date <br /> Completed <br /> Q <br /> 4.6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD, in <br /> CD Remains conjunction with the <br /> In accordance with the California Health and Safety� Y developer, and in <br /> Code, if human remains are uncovered during <br /> g conjunction with <br /> construction at the project site, the College Park <br /> developer or construction contractor shal]immediatel qualified archaeologist <br /> Y and County Coroner, <br /> halt potentially damaging excavation and notify if 3 needed.SJCCDD.The County shall, in turn, immediately <br /> notify the San Joaquin County coroner of the find. The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> rn 7050.5[b]), If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> n determination(HSC Section 7050[c]). Once a Most <br /> Q <br /> cn Likely Descendent(MLD)has been designated by the <br /> NAHC,the MLD, in consultation with the County, <br /> v shall determine the ultimate disposition of the remains. <br /> The responsibilities of the County for acting upon <br /> notification of a discovery of Native American human <br /> c remains are outlined in detail in the PRC Section <br /> 5097.9. Measures likely resulting from the above <br /> could include preservation in place and <br /> capping/avoidance, or removal and continued <br /> monitoring ofground-disturbing activities. <br /> 4.7 DRAINAGE <br /> CD 4.7-2 Drainage--Result in Flooding or Exceed the Before construction MHCSD, in <br /> Capacity of the Storm-drain System <br /> conjunction with the <br /> C> U The College Park developers shall expand WQB I as developer <br /> required to accommodate runoff from the College <br /> Park project,or shall provide the required on-site <br />