Laserfiche WebLink
Cn C <br /> m a <br /> oCollege Park at Mountain House Specific Plan III <br /> CD <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> n. W Implementation <br /> o Mitigation Measure Timing/Schedule te <br /> Responsibility Action <br /> Completed' <br /> °3 retention in-lieu of the required expansion of WQB 1, <br /> before development of those portions of <br /> c Neighborhoods B and D to be served by the DeAnza <br /> CD Boulevard and Mountain House Parkway storm-drain <br /> systems. <br /> CD <br /> 4.8 WATER QUALITY <br /> �2 4.8-1 Water Quality—Potential Temporary NOI(s)submitted to MHCSD, in <br /> Construction-Related Water Quality Effects the Central Valley conjunction with the <br /> _ <br /> The College Park developers shall consult with the RWQCB before developer,and in <br /> Central Valley Regional Water Quality Control Board beginning of coordination with the <br /> (RWQCB)to acquire the appropriate regulatory applicable ground- Central Valley <br /> approvals that may be necessary to obtain Section disturbing or RWQCB <br /> 401 water quality certification, ensure compliance dewatering activities; <br /> with the State Water Resources Control Board water quality <br /> (SWRCB)statewide National Pollutant Discharge performance <br /> Elimination System(NPDES)stormwater permit for standards established <br /> general construction activity and the Central Valley before construction <br /> RWQCB NPDES permit for construction dewatering begins <br /> activity,and obtain any other necessary site-specific <br /> o' W DRs or waivers issued pursuant to the Porter– <br /> Cologne Act. As required under the NPDES <br /> :3stormwater permit for general construction activity, <br /> o the project applicant shall prepare a Stormwater <br /> c4 <br /> Pollution Prevention Plan(SWPPP)and any other <br /> necessary engineering plans and specifications for <br /> Q pollution prevention and control.The SWPPP and <br /> CD other appropriate plans shall: <br /> O < Identify and specify the use of erosion and <br /> sediment control Best Management Practices _ <br /> (BMPs),means of waste disposal, <br /> c� M implementation of approved local plans, non- <br /> stormwater management controls,permanent <br /> postconstruction BMPs, and inspection and <br />