Laserfiche WebLink
M <br /> cC]' A <br /> s' College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> 0 <br /> Miti afion Measure Implementation Implementation &Verification <br /> a- g Timing/Schedule <br /> Z <br /> , Responsibility Action <br /> Date <br /> Completed <br /> CL maintenance responsibilities; <br /> m < Specify the pollutants that are likely to be used <br /> o during construction that could be present in <br /> stormwater drainage and non-stormwater <br /> discharges; <br /> < Specify BMP inspection protocols to ensure that <br /> the BMPs are effective and ensure that the t <br /> monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> CO measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> equipment operation; <br /> CD <br /> < Identify measures to prevent or clean up spills of <br /> -0 hazardous materials used for equipment <br /> operation and hazardous waste; <br /> < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> s . subsequent site-development activities; <br /> < Identify personnel training requirements and <br /> procedures that will be used to ensure that <br /> cn workers are aware of permit requirements and <br /> mproper installation and performance inspection <br /> -0methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> 0 supervisory duties related to implementation of <br /> — the SWPPP;and <br /> < Require all construction contractors to retain a <br /> i <br />