Laserfiche WebLink
K: m <br /> M <br /> cQ' A <br /> o College Park at Mountain House Specific Plan III <br /> 3 Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> o. Mitigation Measure Timing/Schedule ResponsibilityAction Date <br /> Completed.: <br /> m <br /> CL dedication is feasible,no mitigation(in addition <br /> CDto payment of SJMSCP fees)shall be required. <br /> o 0- Bristly sedge and blue skullcap These species <br /> �. are considered narrowly distributed by the <br /> SJMSCP,and dedication of conservation <br /> easements is the preferred option for mitigation. <br /> If these species are found in the project area,the <br /> 3 possibility of establishing a conservation <br /> easement shall be evaluated.If dedication of a <br /> conservation easement is not a feasible option, <br /> the SJMSCP requires a consultation with the <br /> permitting agency representatives on the <br /> a, Technical Advisory Committee to determine the <br /> appropriate mitigation measures. These may <br /> include seed collection or other measures and <br /> would be determined on a population basis, <br /> o taking into account the species type,relative <br /> health,and abundance.After the appropriate <br /> ED <br /> m mitigation has been determined, it shall be <br /> implemented by the project proponents. <br /> 4.10-5 Biological Resources—Conversion of Burrowing Before construction SJCOG, in <br /> Owl Foraging Habitat and Potential Destruction (surveys shall be consultation with DFG <br /> of Active Burrows conducted 2 weeks <br /> W. The College Park developers shall request coverage prior) <br /> under the SJMSCP, fees shall be paid in the amount <br /> co determined by SJCOG during the application and <br /> cn review process for each project under College Park, <br /> C and if SJCOG determines suitable habitat is present <br /> 0 -0 <br /> CD n on or adjacent to a given project site, the following <br /> 0 SJMSCP incidental take avoidance and minimization <br /> o -0 measures shall be implemented: <br /> ► Burrowing owls shall be discouraged from <br /> entering or occupying construction areas by <br />