Laserfiche WebLink
cr) n <br /> W o <br /> oCollege Park at Mountain House Specific Plan III <br /> CD <br /> Mitigation Monitoring and Reporting Program <br /> implementation&Verification <br /> �.. . Implementation Date ._... . <br /> o Mitigation Measure TiminglSchedule Responsibility Action Completed <br /> 2. employing one of several methods outlined in <br /> = Section 5.2.4.15 of the SJMSCP. These include <br /> c retention of tall vegetation,regular discing of the <br /> m site,or use of chemicals or traps to kill ground <br /> squirrels; <br /> °_ ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> su <br /> activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction. If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> • During the nonbreeding season(September I <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation, as <br /> described in the DFG's Staff Report on <br /> .burrowing Owls(DFG 1995). <br /> v <br /> �- During the breeding season(February 1 <br /> through August 31),occupied burrows shall <br /> anot be disturbed and shall be provided with a <br /> 250-foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> concurrence of the permitting agencies' <br /> v <br /> representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> o by the permitting agencies, verifies through <br /> ;:L• noninvasive means that either(1)the birds <br /> have not begun egg laying or(2)juveniles <br /> om from the occupied burrows are foraging <br /> n independently and are capable of <br /> E independent survival. After the fledglings <br />