My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006529
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
19530
>
2600 - Land Use Program
>
PA-0700093
>
SU0006529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:29 AM
Creation date
9/5/2019 10:46:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006529
PE
2611
FACILITY_NAME
PA-0700093
STREET_NUMBER
19530
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
APN
20907023
ENTERED_DATE
4/18/2007 12:00:00 AM
SITE_LOCATION
19530 W GRANT LINE RD
RECEIVED_DATE
4/18/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\APPL.PDF \MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\CDD OK.PDF \MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\EH COND.PDF \MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cn c-s <br /> m o <br /> o @ College Park at Mountain House Specific Plan III <br /> n w Mitigation Monitoring and Reporting Program <br /> Implementation-&Verification <br /> implementation tate <br /> � TiminglSchedule <br /> K Mitigation ation MeasureResponsibility Action <br /> Completed . <br /> o <br /> begins during the nesting season(April 1–August <br /> 31),pre-construction surveys shall be conducted <br /> during'the nesting season in suitable nesting <br /> habitat within 100 feet of areas of project <br /> -a activity.The survey shall be conducted within , <br /> the 2 weeks before construction or tree removal <br /> n begins. A setback of 100 feet from loggerhead <br /> ro shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ry ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Ez Blackbird.If project construction begins during <br /> the nesting season(April I–August 31),pre- <br /> construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity. A <br /> setback of 500 feet from.California horned lark <br /> o and tricolored blackbird nesting areas shall be <br /> established and maintained during the nesting <br /> season for the period encompassing nest building <br /> ;:a and continuing until fledglings leave nests.This <br /> '0 setback applies whenever construction or other <br /> 0 ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that . <br /> are known to be occupied. Setbacks shall be <br /> cin o marked by brightly colored temporary fencing. <br /> 4.10-9 Biological Resources—Conversion of San Joaquin Before construction SJCOG,in <br />
The URL can be used to link to this page
Your browser does not support the video tag.