Laserfiche WebLink
cn c-s <br /> m o <br /> o @ College Park at Mountain House Specific Plan III <br /> n w Mitigation Monitoring and Reporting Program <br /> Implementation-&Verification <br /> implementation tate <br /> � TiminglSchedule <br /> K Mitigation ation MeasureResponsibility Action <br /> Completed . <br /> o <br /> begins during the nesting season(April 1–August <br /> 31),pre-construction surveys shall be conducted <br /> during'the nesting season in suitable nesting <br /> habitat within 100 feet of areas of project <br /> -a activity.The survey shall be conducted within , <br /> the 2 weeks before construction or tree removal <br /> n begins. A setback of 100 feet from loggerhead <br /> ro shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ry ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Ez Blackbird.If project construction begins during <br /> the nesting season(April I–August 31),pre- <br /> construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity. A <br /> setback of 500 feet from.California horned lark <br /> o and tricolored blackbird nesting areas shall be <br /> established and maintained during the nesting <br /> season for the period encompassing nest building <br /> ;:a and continuing until fledglings leave nests.This <br /> '0 setback applies whenever construction or other <br /> 0 ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that . <br /> are known to be occupied. Setbacks shall be <br /> cin o marked by brightly colored temporary fencing. <br /> 4.10-9 Biological Resources—Conversion of San Joaquin Before construction SJCOG,in <br />