Laserfiche WebLink
rn <br /> Q <br /> o College Park at Mountain House Specific Plan.III <br /> Mitigation Monitoring and Reporting Program <br /> a Mitigation Measure Timing/Schedule Implementation <br /> Implementation&Verification <br /> ate <br /> Responsibility Action <br /> Completed <br /> Cx <br /> during the nesting season(February 15–August <br /> .7 31),pre-construction surveys shall be conducted <br /> o during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> ccs <br /> activity. The survey shall be conducted within <br /> v the 2 weeks before construction or tree removal <br /> 0 <br /> begins. If any active nests are found,a setback of > . <br /> 3 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> No ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG, in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior to construction <br /> under the SJMSCP, and fees shall be paid in the activities) <br /> amount determined.by SJCOG during the application <br /> and review process for each project under College <br /> CU Park. During the SJMSCP application process, R <br /> SJCOG will determine whether that specific project <br /> W <br /> a site supports suitable habitat for loggerhead shrike, <br /> cZn <br /> n California horned lark,or tricolored blackbird. If <br /> o a SJCOG determines suitable habitat is present on or <br /> CD adjacent to a given project site,the following <br /> c SJMSCP incidental take avoidance and minimization <br /> 0 _V measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist, <br /> < Loggerhead Shrike.If project construction <br /> 6 <br />