Laserfiche WebLink
cn n <br /> CO o <br /> 0CDCollege Park at Mountain House Specific Plan III - <br /> - Mitigation Monitoring and Reporting Program <br /> Mitigation Measure y _ Timing/Schedule Implementation <br /> Implementation;;&Verification. <br /> Responsibility Action Date <br /> O <br /> -� Completed <br /> below: <br /> o Special-Status Plants Before construction SJCOG, in <br /> < Before any ground-disturbing or vegetation- consultation with <br /> rn clearing activities,a qualified botanist shall USFWS and DFG <br /> Mconduct surveys for the special-status plant <br /> species identified in Table 4.11-1 of the EIR. <br /> n Surveys shall be conducted at the appropriate <br /> time,when the target species would be in flower <br /> and therefore clearly identifiable(i.e.,blooming <br /> period)and in all areas of suitable habitat that <br /> would potentially be disturbed. If no special- <br /> status plants are found, no further mitigation <br /> C" shall be required. <br /> • If special-status plants are found and the <br /> populations can be avoided during project <br /> implementation,they shall be clearly marked <br /> in the field by a qualified botanist for <br /> avoidance during construction activities <br /> v If special-status plant populations cannot be <br /> oavoided, consultations with DFG and/or <br /> USFWS may be required, depending on the <br /> listing status of the species present. These <br /> o consultations shall determine appropriate <br /> CM mitigation measures for any populations that <br /> would be affected by the implementation of <br /> Q the proposed project.Appropriate measures <br /> CD may include the creation of off-site <br /> populations through seed collection or <br /> transplanting,preservation and enhancement <br /> of existing populations, or restoration or <br /> c8 Q creation of suitable habitat in sufficient <br /> 3 > quantities to compensate for the impact. <br /> California Red-Legged Frog Before construction SJCOG, in <br />