Laserfiche WebLink
M <br /> Q <br /> n <br /> oCollege Park at Mountain House Specific Plan III <br /> K <br /> Mitigation Monitoring and Reporting Program <br /> 0 <br /> :3 Implementation Implementation&Verification <br /> o_ Mitigation Measure Timing/Schedule Date <br /> v Responsibility Action Completed <br /> Q 1 Before project activity,USFWS shall be consultation with <br /> cXo consulted to determine whether widening of USFWS <br /> o Grant Line Road has potential to adversely affect <br /> California red-legged frog. It may be necessary <br /> to conduct a formal habitat assessment and <br /> surveys to make such a determination. If it is <br /> m <br /> determined that adverse effects are unlikely to ; <br /> occur, no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required. <br /> Specific mitigation measures would be developed <br /> during the consultation process. Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.These may include limiting <br /> activities to certain seasons, minimizing <br /> vegetation removal and in-water construction <br /> activities,conducting pre-construction surveys, <br /> and conducting daily surveys and monitoring of <br /> construction areas. If necessary, appropriate <br /> compensation for loss of habitat and other adverse <br /> effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> = habitat and creation of additional habitat. <br /> U) o <br /> CDSwainson's Hawk Before construction SJCOG,in <br /> o-aW < If project construction begins during the (surveys shall be consultation with DPG <br /> 0. Swainson's Hawk nesting season,as defined by conducted 2 weeks <br /> r DFG(March 1 to September 15),pre-construction prior to construction <br /> o v surveys shall be conducted in areas of suitable activities) <br /> nesting habitat within 0.5 mile of project activity. <br /> `K = Surveys shall be conducted by a qualified <br />