Laserfiche WebLink
K, <br /> co C-) <br /> m o <br /> o College Park at Mountain Mouse Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> �• °� Implementation&Verification <br /> o Implementaton Date Timing/Schedule <br /> (ScheduleMitigation Measure Responsibility Action Completed <br /> 6 <br /> �c c <br /> biologist within the 2 weeks before construction <br /> or tree removal begins. If no active nests are <br /> c found, no further mitigation shall be required. <br /> ® < If active nests are found, impacts shall be <br /> avoided by establishment of appropriate buffers. <br /> CD <br /> No project activity shall commence within the <br /> buffer area until a qualified biologist confirms <br /> that the nest is no longer active.DFG guidelines <br /> recommend implementation of 0.25-or 0.5-mile <br /> buffers,but the size of the buffer may be adjusted <br /> if a qualified biologist and DFG determine it <br /> would not be likely to adversely affect the nest. <br /> Monitoring of the nest by a qualified biologist <br /> may be required if the activity has potential to <br /> adversely affect the nest. <br /> Burrowing Owl Before construction SJCOG, in <br /> < Before project activity,focused surveys for consultation with DFG <br /> burrowing owls shall be conducted by a qualified <br /> biologist in areas of suitable habitat on and <br /> o within 250 feet of the project site. Surveys shall <br /> be conducted in accordance with DFG protocols <br /> (DFG 1995). <br /> o' < If no occupied burrows are found in the survey <br /> area, a letter report documenting survey methods <br /> and findings shall be submitted to DFG,and no <br /> CL further mitigation is necessary. <br /> CD <br /> < If an occupied burrow with an active nest is <br /> o found, impacts shall be minimized by <br /> establishing a 250-foot buffer area around the <br /> burrow.No project activity shall occur within the <br /> 8 Q buffer area until a qualified biologist confirms <br /> > that the nest is no longer active.The size of the <br /> buffer area may be adjusted if a qualified <br />