Laserfiche WebLink
Cn 0 <br /> Co o <br /> C_ <br /> CD College Park at Mountain Mouse Specific Plan III <br /> e Mitigation Monitoring and Reporting Program <br /> .Implementation.&..Verification <br /> c Mitigation Measure Timing/Schedule Implementation Date <br /> o Responsibility Action <br /> Completed <br /> With-Project Conditions on Anticipated Network <br /> o For consistency with previously adopted roadway <br /> standards,the County shall extend the standard of <br /> LOS D to the segment of Byron Road east of Grant <br /> Line Road. <br /> CD <br /> Because Byron Road is a major regional arterial <br /> serving the area,the County shall extend <br /> w implementation of Mountain House Master Plan <br /> (MHMP) EIR mitigation measure 4.12-5(e)to apply to <br /> Byron Road cast of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> 4.12-1 Air Quality—Generation of Temporary,Short- Before construction SJVAPCD,in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> control measures during construction(see"Regulatory <br /> Setting,"above). <br /> The latest version of the San Joaquin Valley Air <br /> Pollution Control District(SJVAPCD)control <br /> measures are included in the Guide for Assessing and <br /> Mitigating Air Quality Impacts(SJVAPCD 199 8)and <br /> S repeated in the"Regulatory Setting"subsection.The <br /> SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> C- the SJVAPCD to implement the current version of the <br /> ameasures at the time individual development <br /> 0 applications are received by the County for <br /> ' development under College Park. <br /> 4.12-2 Air Quality—Potential Generation of Toxic Air Before construction SJVAPCD, in <br /> M Contaminants(TACs) begins and during. conjunction with the <br /> 3 ► Asbestos--The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1. <br />