Laserfiche WebLink
M <br /> p <br /> n <br /> o. College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 0 <br /> Implementation Implementation�Verification... <br /> o Mitigation Measure Timing/Schedule ResponsibilityDate <br /> Action Completed <br /> ► Mobile-Source TAC Emissions—The College <br /> Park applicants for industrial or commercial land <br /> o uses shall coordinate with the SJVAPCD to <br /> assess situations in which toxic risk from diesel <br /> particulate matter(PM)may occur and to review <br /> omethodologies that may become available to <br /> `a estimate the risk.The developers shall implement <br /> iv <br /> any project-level measures adopted by the tL <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD,in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> N The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> 0 refuse piles are removed. <br /> CD 4.12-5 Air Quality—Increased Long-Term Regional Before construction SJVAPCD, in <br /> Emissions of Criteria Pollutants begins and during conjunction with the <br /> The College Park developers shall implement all of construction developer <br /> the mitigation measures as recommended in the <br /> o Guide for Assessing and Mitigating Air Quality <br /> Z3 Impacts(SJVAPCD 1998). Many of these measures <br /> are already included in the proposed project design <br /> = and/or are already required by the MHMP and by <br /> mitigation in the MHMP and Delta College EIRs. <br /> Z3 m <br /> 0 <br /> c, <br /> C-) <br /> C7 -� <br /> o �, <br />