Laserfiche WebLink
t <br /> In 0 <br /> a) O <br /> CD <br /> vcc College Park at Mountain House Specific Plan III <br /> _ Mitigation Monitoring and Reporting Program <br /> .- ....Implementation&.Verification,_ <br /> Mitigation Measure Timingl5chedule Responsibility Action <br /> Date <br /> .t � Completed <br /> 4.13.`NOISE <br /> 0 4.13-1 Noise—Generation of Temporary Construction During construction SJCCDD,in <br /> rn <br /> Noise conjunction with the <br /> Cn < Limit project construction activities to the hours developer <br /> between 6:00 a.m. and 9:00 p.m. <br /> Comply with the San Joaquin County <br /> Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> w <br /> recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> - receptors.Temporary acoustic barriers may be <br /> m installed around stationary equipment, if <br /> onecessary. <br /> 0 4.13-Z Noise—Generation of New Stationary-Source During design phase SJCCDD,in <br /> Noise and during conjunction with the <br /> o The project applicants shall incorporate the measures construction devel6per <br /> m <br /> identified below into the project design. <br /> Q- Commercial,Office,and Industrial Uses <br /> CD Industrial and commercial land uses proposed as part <br /> 0 of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> exceedance of 55 dBA L,q during daytime hours <br /> c4 0 (7:00 a.m. to 10:00 p.m.)or 50 dBA L,during <br /> > nighttime hours(10:00 p.m.to 7:00 a.m.)at off-site <br /> noise-sensitive receptors. In addition, design and - <br /> I <br />