Laserfiche WebLink
� n <br /> 7 a <br /> o Ln College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> c v Implementation&Verification <br /> RL lmpiementationW. �- l]afe -` <br /> Mitigation Measure Timing/Schedule Responsibility Action Completed <br /> o <br /> F�. land uses,the operation of on-site landscape <br /> a maintenance equipment shall be limited to the <br /> least noise-sensitive periods of the day,between <br /> ro the hours of 7:00 a.m. and 10:00 P.M. <br /> After construction SJCCDD,in <br /> 4.13-3 Noise Increase Traffic Noise conjunction with the <br /> The project applicants shall implement the measures <br /> identified below. developer <br /> W < Before occupancy of the first residence at <br /> College Park,a noise barrier shall be constructed <br /> by the College Park developers between the five <br /> existing residences located on the north side of <br /> Grant Line Road between Central Parkway and <br /> .n the Alameda County line(Receptor 14 in Figure <br /> 4.13-2 of the EIR)and the northern travel lane of <br /> Grant Line Road.The noise barriers may consist <br /> of a wall,berm,or combination thereof.The <br /> exact location,height, and character of the noise <br /> barrier shall be determined by a noise consultant <br /> approved by the County. The sound barrier shall <br /> oreduce outdoor noise levels at the center of the <br /> front yards of the five existing residences to <br /> K below 65 dBA LdnICNEL. If Grant Line Road is <br /> o widened at this location subsequent to <br /> construction of the sound barrier but before <br /> removal of the five residences under Specific <br /> Plan II,the sound barrier shall be relocated,as <br /> required. If the five existing residences are <br /> �a removed under Specific Plan II before occupancy <br /> 0 <br /> of the first residence under the College Park <br /> project,this mitigation measure shall not require <br /> E; m implementation.This mitigation shall be funded <br /> through fair-share payments by the College Park <br /> 3 developers. <br />