Laserfiche WebLink
3z rn <br /> College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> �. Mitigation MeasureTiminglScheduie Implementation <br /> Implementation&Verification <br /> Responsibility <br /> Date <br /> °1 Action <br /> C 4.13-4 Noise—ComProposed of Pro osed Land Uses Completed <br /> . After construction SJCCDD, in <br /> ro exceeding Predicted Noise Levels <br /> The College Parc developers shall implement the conjunction with the <br /> following measures: developer; in <br /> CM < Traffic Noise—Arterials.Before occupancy of consultation with a <br /> qualified acoustical <br /> c0 the first residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EIR ' <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment. The noise barrier may consist of a wall, <br /> w berm., or combination thereof. The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County. The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> CD below 65 dBA Ld /CNEL and as close to 60 dI3A <br /> CD <br /> L&/CNEL as feasible. This mitigation shall be <br /> funded through fair-share payments by the <br /> R4 College Park developers. <br /> 0 <br /> o� <br /> z ' <br /> CA O <br /> Cll y <br /> CD <br /> L U) <br /> O � <br /> [U CP <br /> � n <br /> � n <br /> 0 -0 <br /> o m <br /> c � <br />