Laserfiche WebLink
A <br /> 0 <br /> L � <br /> vCollege Park at Mountain House Specific Plan III <br /> �. Mitigation Monitoring and Reporting Program <br /> n 5'L <br /> o ' Implementation.&Verification <br /> Mitigation Measure Timing/Schedule Implementation <br /> 0 Responsibility Action Date <br /> Completed <br /> 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> o Mountain House Parkway construction <br /> The following measures shall be implemented by the <br /> ro College Park developers: <br /> C <br /> @ < If the landscaping and edge treatments required <br /> �. by the MHMP and MHCSD Design Manual have <br /> -0 not been developed on the east side of Mountain <br /> m House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property, the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers. This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Park developers.In addition,the berm <br /> shall be constructed by the College Park developers <br /> o using contoured and rounded slopes to avoid angular <br /> face slopes, This shall be done concurrent with <br /> development of the pond. <br /> 0 <br /> to <br /> rn _ <br /> 0 <br /> in <br /> `v <br /> o m <br /> in p <br /> iv n <br />