Laserfiche WebLink
C1r 0 <br /> n� o <br /> CD <br /> CO CD College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation.8�Verification <br /> Mitfgation Measure TiminglSchedule Implementation Date <br /> OResponsibility Action <br /> -t c Completed <br /> 7 <br /> 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture-w--Conflict with Existing Before and during San Joaquin County <br /> CD Land Uses construction,and Community <br /> CO The College Park developers shall implement the During design phase Development _ <br /> rn following measures: Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD), in <br /> Irrigation District(BBID)canals from proposed conjunction with the <br /> urban development until such time as the canals developer, and in <br /> are filled.The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons, and shall <br /> be developed in coordination with BBID to <br /> ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5,identified <br /> in Section 4.9, "Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> gas pipelines within the PG&E—Chevron <br /> ' easement that bisects the project site. <br /> < Identify an agricultural buffer of no less than 100 <br /> o feet at the time of Tentative Map approval for <br /> o any new units in the residential area in and south <br /> of Grant Line Village and adjacent to the County <br /> m line. <br /> CL <br /> m <br /> a <br /> a <br /> v <br /> E3 rn <br /> rfl p <br /> 3 <br />