Laserfiche WebLink
K rn <br /> ca <br /> o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 0 <br /> Implementation&Verification <br /> o Mitigation Measure TiminglScheduie Implementation msi i <br /> Action Date <br /> v Completed <br /> a 4.2-4 Land Use and Agriculture--Conflict Substantially After discontinuance SJCCDD, in <br /> (Dwith Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> a Act Contracts disposal developer <br /> The project applicants shall implement the following <br /> ca mitigation measure: <br /> o < At such time as the interim land disposal of <br /> treated wastewater at the Pombo property is1 <br /> 3 discontinued,GNK, LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e., feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction SJCCDD, in <br /> Adjacent Agricultural Operations conjunction with the <br /> < Before development, the project developers shall developer, and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> water from the canals by the installation of <br /> o pipelines and other means.The filling of the <br /> irrigation canals shall be approved by BBID. <br /> 4.6 CULTURAL RESOURCES <br /> 4.6-2 Cultural Resources—Potential During construction SJCCDD, in <br /> Destruction/Damage to Undiscovered Cultural conjunction with the <br /> c Resources developer,and in <br /> If discovery of unknown cultural materials is made conjunction with <br /> during construction,ground-disturbing activities at qualified <br /> a the construction site where the discovery was made archaeologist,if <br /> shall be halted.The College Park developers or needed. <br /> o C/) construction contractor shall contact the San Joaquin <br /> WCD-0 <br /> oo County Community Development Department <br /> 5 " (SJCCDD)immediately, and a qualified professional <br /> narchaeologist acceptable to County staff shall be <br /> notified and retained by the College Park developer. <br /> c = The archaeologist shall determine whether the <br /> resource represents a"unique archaeological <br />