Laserfiche WebLink
E: m <br /> • d <br /> n <br /> College Park at Mountain House Specific Plan III <br /> o' <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> o- Mitigation Measure Timing/Schedule Implementation Date. <br /> �• Responsibility Action <br /> Completed ; <br /> v <br /> dedication is feasible,no mitigation(in addition <br /> @ to payment of SJMSCP fees)shall be required. <br /> o 1'- Bristly sedge and blue skullcap.These species <br /> 7L are considered narrowly distributed by the <br /> SJMSCP, and dedication of conservation <br /> oeasements is the preferred option for mitigation. f %k <br /> If these species are found in the project area,then <br /> B possibility of establishing a conservation <br /> easement shall be evaluated. If dedication of a <br /> conservation easement is not a feasible option, <br /> the SJMSCP requires a consultation with the <br /> permitting agency representatives on the <br /> Technical Advisory Committee to determine the <br /> appropriate mitigation measures. These may <br /> include seed collection or other measures and <br /> would be determined on a population basis, <br /> o taking into account the species type,relative <br /> co health, and abundance. After the appropriate <br /> CD mitigation has been determined, it shall be <br /> implemented by the project proponents. <br /> 4.10-5 Biological Resources—Conversion of Burrowing Before construction SJCOG, in <br /> Owl Foraging Habitat and Potential Destruction (surveys shall be consultation with DFG <br /> of Active Burrows conducted 2 weeks * <br /> v The College Park developers shall request coverage prior) *+ <br /> under the SJMSCP, fees shall be paid in the amount <br /> o determined by SJCOG during the application and <br /> review process for each project under College Park, <br /> 0 Cn and if SJCOG determines suitable habitat is present <br /> mon or adjacent to a given project site, the following <br /> SJMSCP incidental take avoidance and minimization <br /> C� p measures shall be implemented: <br /> a ► Burrowing owls shall be discouraged from <br /> c - entering or occupying construction areas by <br />