Laserfiche WebLink
C/) 0 <br /> CL) v <br /> m <br /> m College Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> RL <br /> n ' Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Date <br /> . Responsibility Action <br /> Completed <br /> employing one of several methods outlined in <br /> = Section 5.2.4.15 of the SJMSCP. These include <br /> retention of tall vegetation,regular discing of the <br /> `D site, or use of chemicals or traps to[till ground . <br /> cn. <br /> a squirrels; <br /> CD <br /> �' ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review). The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction. If burrowing owls are <br /> found, the following measures shall be <br /> implemented: <br /> • During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as F <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> m <br /> ' During the breeding season(February I <br /> through August 31), occupied burrows shall <br /> 0 not be disturbed and shall be provided with a <br /> 6 250-foot protective buffer until and unless <br /> cQ the Technical Advisory Committee, with the ' <br /> a concurrence of the permitting agencies' <br /> C- representatives on the Technical Advisory <br /> ro Committee,or a qualified biologist approved <br /> 0 by the permitting agencies,verifies through <br /> ' noninvasive means that either(1) the birds <br /> -a have not begun egg laying or(2)juveniles <br /> co M from the occupied burrows are foraging <br /> E3 > independently and are capable of <br /> independent survival. After the fledglings <br />