Laserfiche WebLink
cn r7 <br /> W o <br /> m <br /> ami College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o ' Implementation -Verification <br /> _ Miti anon Measure Implementation <br /> 0 9 Timing/Schedule <br /> .� Responsibility Action Date <br /> Completed <br /> begins during the nesting season(April I–August <br /> 0 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> ca habitat within 100 feet of areas of project <br /> activity. The survey shall be conducted within <br /> CD <br /> -- the 2 weeks before construction or tree removal <br /> begins.A setback of 100 feet from loggerhead <br /> shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Blackbird.If project construction begins during <br /> v' the nesting season(April 1–August 31),pre- <br /> 0 construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> owithin 500 feet of areas of project activity, A <br /> o setback of 500 feet from California homed lark <br /> and tricolored blackbird nesting areas shall be <br /> established and maintained during the nesting <br /> Q season for the period encompassing nest building <br /> and continuing until fledglings leave nests. This <br /> CD <br /> o setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> is m are known to be occupied. Setbacks shall be <br /> d marked by brightly colored temporary fencing. <br /> Before construction SJCOG, in <br /> 3 4.10-9 Biological Resources—Conversion of San Joaquin <br />