Laserfiche WebLink
M <br /> n <br /> v College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> 6 Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Action <br /> Completed <br /> v <br /> n during the nesting season(February 15–August <br /> 31),pre-construction surveys shall be conducted <br /> CD <br /> during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> activity. The survey shall be conducted within <br /> 0 <br /> the 2 weeks before construction or tree removal <br /> begins. If any active nests are found, a setback of <br /> v 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> o ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied, Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG, in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> CD Loss of Active Nests conducted 2 weeks <br /> v The College Park developers shall request coverage prior to construction <br /> under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College , <br /> Park. During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> site supports suitable habitat for loggerhead shrike, <br /> Z, m California homed lark, or tricolored blackbird. If <br /> CCnSJCOG determines suitable habitat is present on or <br /> CD adjacent to a given project site,the following <br /> SJMSCP incidental take avoidance and minimization <br /> n v measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> < Loggerhead Shrike. If project construction <br />