Laserfiche WebLink
Cn n <br /> CO o <br /> CD <br /> m CD College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation.&'Ve-rification' <br /> Mitigation Measure TiminglSchedule Date <br /> Responsibility Action Completed <br /> �- below: - <br /> Special-Status Plants Before construction SJCOG, in <br /> @ < Before any ground-disturbing or vegetation- consultation with <br /> -a clearing activities,a qualified botanist shall USFWS and DFG <br /> Cl) conduct surveys for the special-status plant <br /> species identified in Table 4.11-1 of the ETR. <br /> -v Surveys shall be conducted at the appropriate <br /> °1 time, when the target species would be in flower <br /> and therefore clearly identifiable(i.e., blooming <br /> period)and in all areas of suitable habitat that <br /> would potentially be disturbed. if no special- <br /> status plants are found, no further mitigation <br /> shall be required. <br /> If special-status plants are found and the <br /> populations can be avoided during project <br /> implementation,they shall be clearly marked <br /> in the field by a qualified botanist for <br /> avoidance during construction activities <br /> m If special-status plant populations cannot be <br /> 0 avoided, consultations with DFG and/or <br /> o USFWS may be required, depending on the <br /> listing status of the species present. These <br /> consultations shall determine appropriate <br /> mitigation measures for any populations that <br /> would be affected by the implementation of <br /> Q the proposed project, Appropriate measures <br /> (D may include the creation of off-site <br /> populations through seed collection or <br /> - transplanting,preservation and enhancement <br /> -U of existing populations, or restoration or <br /> © creation of suitable habitat in sufficient <br /> > quantities to compensate for the impact. <br /> California Red-Legged Frog Before construction SJCOG, in <br />