Laserfiche WebLink
E: rn <br /> = Q <br /> co � <br /> College Park at Mountain House Specific Plan III <br /> EY <br /> Mitigation Monitoring and Reporting Program <br /> a Imp lementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation . Date <br /> Responsibility Action <br /> Completed <br /> CL ► Before project activity, USFWS shall be consultation with <br /> M consulted to determine whether widening of USFWS <br /> CD <br /> Grant Line Road has potential to adversely affect <br /> California red-legged frog. It may be necessary <br /> to conduct a formal habitat assessment and <br /> osurveys to make such a determination. If it is <br /> determined that adverse effects are unlikely to <br /> 3 occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required. <br /> Specific mitigation measures would be developed <br /> during the consultation process. Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.These may include limiting <br /> activities to certain seasons, minimizing <br /> co <br /> co vegetation removal and in-water construction <br /> m activities,conducting pre-construction surveys, <br /> m <br /> and conducting daily surveys and monitoring of <br /> 3 construction areas. If necessary,appropriate <br /> o compensation for loss of habitat and other adverse <br /> effects would also be developed.This could ' <br /> a include measures such as enhancement of existing <br /> = habitat and creation of additional habitat. <br /> W = <br /> W cn Swainson's Hawk Before construction SJCOG, in <br /> o < If project construction begins during the (surveys shall be consultation with DFG <br /> Swainson's Hawk nesting season, as defined by conducted 2 weeks <br /> DFG(March I to September 15), pre-construction prior to construction <br /> o surveys shall be conducted in areas of suitable activities) <br /> > > nesting habitat within 0.5 mile of project activity. <br /> s = Surveys shall be conducted by a qualified <br />