Laserfiche WebLink
M <br /> r: C7 <br /> cQ' � <br /> College Park at Mountain House Specific Plan III <br /> a' <br /> = Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation Date <br /> �. Responsibility Action <br /> Completed <br /> biologist and DFG determine it would not be <br /> likely to adversely affect the nesting pair.DFG <br /> CD <br /> -v shall also be consulted to determine if it is <br /> -. necessary to temporarily preserve foraging <br /> habitat(in addition to the buffer area)until the <br /> onest is no longer active. <br /> < If feasible,250-foot buffer areas shall also be <br /> established around all other occupied burrows. If <br /> this is not feasible,DFG shall be consulted to <br /> determine whether smaller buffer areas and/or <br /> relocation of owls is necessary. Relocation may <br /> include passive techniques,such as use of one- <br /> way doors to encourage owls to move to <br /> 00 <br /> alternative burrows outside the impact area,or <br /> capture and movement of owls to specific <br /> mitigation sites. <br /> o Other Nesting Raptors Before construction SJCOG, in <br /> ca < If project construction begins during the raptor (surveys shall be consultation with DFG <br /> (D nesting season(February 15 to August 31), pre- conducted 2 weeks <br /> -v <br /> W construction surveys shall be conducted by a prior to construction <br /> n, qualified biologist in areas of suitable nesting activities) <br /> habitat within 500 feet of project activity. Surveys <br /> shall be conducted within 2 weeks before the <br /> beginning of construction or tree removal. If no <br /> active nests are found,no further mitigation shall <br /> Cn 0 be required. <br /> M < If active nests are found,impacts shall be avoided <br /> o-o by establishment of appropriate buffers.No <br /> a CD project activity shall commence within the buffer <br /> �--", area until a qualified biologist confirms that the <br /> on v nest is no longer active. DFG guidelines <br /> recommend implementation of 500-foot buffers, <br /> but the size of the buffer may be adjusted if a <br />